1. Select an appropriate molding
machine; determine reasonable operation conditions to ensure no damage to the
mold and poor efficiency due to improper clamping force. When selecting
injection machine, the considerations would be the maximum amount of shot
volume, effective distance of pulling rod, mold mounting dimensions on the
plates of the injection machine, maximum and minimum mold thickness, mold plate
stroke, ejection ways and stoke, injection pressure, clamping force and the
etc.
2. After mold installed into plastic
injection machines, the first operation carried should not be direct plastic
shooting, but observe the moving flexibility of various mold components and the
operation phenomenon. Check ejector stroke, opening stroke in place and if the
mold P/L surface is tight and clamping plates are screwed tighten and so on.
3. The plastic mold under operation should maintain a
stable running temperature; prevent a swift temperature change. Mold under
normal temperature would extend its life.
4. Moving components on the mold, such
as guide pins, return pins, ejector pins and moving core insert, etc., should
always be observed, regularly checked, timely wiped and properly lubricated.
Especially in the summer when the temperature is high, at least on each shift
they need to be lubricated 2 times to ensure these moving parts in flexible
movement condition and prevent the possible scratches.
5. Before mold closing, it should be checked
if the cavity is clean, absolutely free of residual plastic parts, or any other foreign material.
Prohibit applying the hard steel bars when cleaning tool cavity surface to
prevent any scratches.
6.The very specific demand for the surface
of the mold cavity. If the surface roughness Ra is less than or equal to the
special requirements of 0.2μm, definitely the hand, silk or cotton ball is
forbidden to use, only use dried, filtered and compressed air to blow, very
good facial napkin or absorbent cotton balls dipped in alcohol to scrub gently.
7. The cavity surface of plastic mold
should be cleaned regularly. During the molding process, under high temperature
and pressure, the plastic material tends to get decomposed into low molecular
compound which would erode the mold cavity, so after a period of time the
bright cavity surface gradually lost its brightness and then lower product
quality. Therefore the regular cleaning should be applied with facial napkin or
absorbent cotton balls, and after cleaning, the surface need be timely dried.
8. If temporarily shut down need, the
mold should be closed, does not let the cavity and core expose to the air to
prevent accidental damage. If downtime is expected to exceed 24 hours, the
cavity and core should be sprayed with the corrosion preventive or mold release
agents on the surface and covered with rigid plastic sheet, especially during
the rainy season, a short time downtime also need corrosion resistant
treatment. Moisture in the air will reduce the surface quality of the mold
cavity and the article surface quality. When the mold works again, the oil on
the mold surface should be removed before use. Especially for the mirror demand
surface, the filtered and compressed air should be used to clean the surface,
and then blown dry with hot air. Otherwise they will leave defect in the molded
products.
9. After a temporary shutdown, when operate
the mold again, slider stoppers should be checked. Keep it in mind, you
couldn’t’ be too careful
10. To extend the life of cooling
channels, when mold is under maintenance, dried and compressed air should be
used to clear the residual water in the cooling channel, and then blow sparingly
engine oil into the channel to coat the channel for corrosion preventive.
11. During operation, operators should carefully
check the status of the control unit for abnormal auxiliary systems. Heating
and control systems maintenance is particularly important for hot runner mold. In
the end of each production, all coil heaters, band heaters and thermocouples
should be measured and compared with the printed technical demand of the data
to ensure the integrity of its functions. At the same time, the control circuit
may be tested by the meter. Emptying the oil inside the hydraulic cylinder, and
sealing the opening to prevent the leakage of hydraulic oil during
transportation will prevent the possible pollution of the surrounding
environment.
12. In the injection molding process, if
abnormal sound is heard or other abnormal situation occurs; operation should
immediately be stopped for inspection. Mold maintenance technician for the
normal operation of the plant should conduct inspection tours; any found
abnormal phenomenon should be promptly treated and recorded.
13. When the number of products is achieved,
the mold cavity should be sprayed with corrosion preventive before pulled from
the injection machine or fastening a new mold to injection machine, mold and
its auxiliaries should be sent to mold maintenance technician, along with the
last 6 complete shots of qualified products for study. Furthermore, a new form should
list the injection machine specification, operation date, a total number of
products and the current mold situation. If the mold has problems, the form should
be noted with the problems, propose to modify and improve specific
requirements, and also come up with an untreated sample for fixing technician
reference.