steel heat treatment process

添加图片说明 The steel heat treatment process are roughly divided into the following: 1. Annealing Heat the steel to a certain temperature and keep for a period of time, and then make it slowly cooling, which is called the annealing. Annealing is a heat treatment method which steel is heated to a temperature that is a phase change or part of the phase change. The purpose of annealing is to eliminate the defects of the organization, improve the microstructure and refine the grain ,improve the mechanical properties of steel, reduce the residual stress and reduce the hardness, improve the plasticity and toughness, improve the cutting performance. So the annealing is to eliminate and improve the left behind of the previous procedure, the organization of the defects and the internal stress, and to prepare for the follow-up process, so the annealing is a semi-product heat treatment, also known as pre-heattreatment. 2. normalizing normalizing is to be heated to the critical temperature , ...

5 key steps for plastic mold maintenance

Level level 1.Routine Maintenance Content Before the mold is removed from the press, it is to be heated (if the mold is chilled)so that all surface condensation is evaporated. With the mold still warm, internalmold surfaces should be gently cleaned with shop safety solvent to remove any residual dirt and grime, the ejector system moved fully forward, then sprayed with approved rust preventive before the ejector system is retracted and the mold closed.Lenses and highly polished surfaces should be protected following specificinstructions. All water lines should be drained and blown free of all residual water to avoid buildup of rust due to standing water. It is imperative that no water be trapped insidemold.Check and assure all bolts, plates, clamps etc. are in place and tight. Bag the last shot as an example of the typical quality of this run. Store these partswith the mold. Maintenance Frequency Every time the mold is pulled from production or put back into production level 2....