Skip to main content

Posts

Showing posts with the label PET prefrom mould

PET prefrom mould filling stage of injection molding

PET preform mould Filling stage PET preform mould Filling is the first step in the process of injection molding; the filling time begins from the close of the PET preform mould until the 95% filling of mold cavity. In theory, the shorter the filling time is, the higher the molding efficiency will be. But in practice, the molding time or injection speed are restricted by many factors. PET preform mould by stevencheng High speed filling. High speed filling will lead to high shear rate, plastic viscosity will decrease due to the dilute effect of shear, which would reduce the flow resistance of the plastic; local viscous heating effect also will make the solidified layer thickness thinner. Therefore, in the flow control stage, the filling is often determined by the size of the volume. Due to the high speed filling, the shear dilute effect of the melt is very obvious, but the cooling effect for the thin wall item is not obvious. Low speed filling. When the heat conduction controls the ...